• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Preventive Maintenance Checks and Services (PMCS) for CBT LHS (Contd). - TM-5-5420-280-100390
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) FOR PALLET

TM-5-5420-280-10 Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  350    351    352    353    354  355  356    357    358    359    360  
TM 5-5420-280-10
0042 00
Preventive Maintenance Checks and Services (PMCS)
for CBT LHS (Contd).
NOT FULLY
ITEM
ITEM TO
INTERVAL
PROCEDURE
MISSION
NO.
CHECK/SERVICE
CAPABLE IF:
WARNING
When checking main manifold,
keep clear of CBT exhaust
system. Exhaust system may be
hot! Failure to comply may
result in injury to personnel.
16
After
Main
Visually check main manifold for leaks
Any Class III leaks
manifold (5)
or damaged hardware.
are detected or
hardware is
damaged.
5
END OF WORK PACKAGE
0042 00-11/12 blank






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.