• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ASSEMBLY OF PLATFORM
ASSEMBLE A FULL STERN CONFIGURATION (cont) - TM-55-1945-205-10-2_115

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  80    81    82    83    84  85  86    87    88    89    90  
TM 55-1945-205-10-2 0015 00 4 0015 00 9. Install mooring bitts and quick disconnects. (WP 0016 00) 10.   Install fenders. (WP 0018 00) 11.   Install safety equipment. (WP 0019 00) 12.   Install tactical quiet generator container. (WP 0020 00) 13.   Install personnel shelter. (WP 0021 00) 14.   Install Emergency Anchor System (EASY). (WP 0022 00) 15.   Install light towers. (WP 0023 00) 16.   Install dunnage mats. (WP 0019 00) ASSEMBLE A FULL STERN CONFIGURATION 127( The full RRDF stern configuration consists of nine intermediate sections. FULL RRDF STERN  CONFIGURATION CORNER  FENDERS DUNNAGE  M AT PERSONNEL SHELTER GENERATOR  SHELTER EASY 6 FT BY 12 FT FENDER 5 FT BY 10 FT FENDE R CORNER  FENDER CORNER FENDER CORNER  FENDER CORNER FENDER 4 FT BY 12 FT FENDER 3 FT BY 5 FT FENDER CORNER FENDER CORNER FENDER DUNNAG E  M AT 3 FT BY 5 FT FENDER 3 FT BY 5 FT FENDER 4 FT BY 12 FT FENDER 3 FT BY 5 FT FENDER 5 FT BY 10 FT FENDER DUNNAGE M AT







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.