• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALLATION OF LIGHT TOWER UNIT (cont) - TM-55-1945-205-10-2_157
INSTALL LIGHT TOWER BOOM LIGHTS - TM-55-1945-205-10-2_159

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  120    121    122    123    124  125  126    127    128    129    130  
TM 55-1945-205-10-2 0023 00 4 0023 00 INSTALL LIGHT TOWER ON AFT LIGHT TOWER UNIT 127( Light tower is installed on forward light tower unit. 1. Disconnect drawbar eye (11) from fork lift truck towing pintle. 2. Extend both outriggers (21) and install locking pins (22) fully. 3. Level unit using jacks (23) and bubble level indicator (24) on drawbar (calm water) or measure from deck at four corners of unit. 4. Secure light tower trailer to RRDF platform with tiedowns. :,1* 5. Remove hitch pins from upper light tower stowage on container side and remove tower from container. 21 22 22 24 23 21 23 23







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.