TM 5-1940-322-24
FIELD MAINTENANCE INSTRUCTIONS
BRIDGE ERECTION BOAT (BEB)
MK II-S
P/N 12492423
ACCESS PANEL AND HINGES MAINTENANCE
REMOVAL, CLEANING AND INSPECTION, AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
References
TM 5-1940-322-24P
Forward Repair System (FRS)
Equipment Condition
Materials/Parts
Junction box and bus bars removed from access
0044 00-1