TM 5-1940-322-24
FIELD MAINTENANCE INSTRUCTIONS
BRIDGE ERECTION BOAT (BEB)
MK II-S
P/N 12492423
FUEL TANK REPLACEMENT
REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Personnel Required
Forward Repair System (FRS)
Two
References
Materials/Parts
Equipment Condition
Battery hatch opened and secured
(TM 5-1940-322-10).
Battery ground cables disconnected
Engine hatches opened and secured
(TM 5-1940-322-10).
0071 00-1