TM 5-1940-322-24
FIELD MAINTENANCE INSTRUCTIONS
BRIDGE ERECTION BOAT (BEB)
MK II-S
P/N 12492423
TURBOCHARGER MAINTENANCE
REMOVAL, CLEANING AND INSPECTION, AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Materials/Parts (Contd)
Forward Repair System (FRS)
References
Materials/Parts
Equipment Condition
Engine hatches opened and secured
(TM 5-1940-322-10).
Cloth (item 8, WP 0210 00)
0107 00-1