TM 5-1940-322-24
FIELD MAINTENANCE INSTRUCTIONS
BRIDGE ERECTION BOAT (BEB)
MK II-S
P/N 12492423
ENGINE REAR LIFTING BRACKET REPLACEMENT
REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Equipment Condition
Forward Repair System (FRS)
Engine hatches opened and secured
(TM 5-1940-322-10).
0114 00-1