TM 5-1940-322-24
FIELD MAINTENANCE INSTRUCTIONS
BRIDGE ERECTION BOAT (BEB)
MK II-S
P/N 12492423
ENGINE REPLACEMENT
REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Materials/Parts (Contd)
Forward Repair System (FRS)
Insulation sleeving, electrical
(item 41, WP 0171 00)Antiseize compound
Chains
Personnel Required
Lifting device
Three
Materials/Parts
References
Equipment Condition
Mast lowered and secured (TM 5-1940-322-10).
Engine hatches opened and secured
(TM 5-1940-322-10).
Battery ground cables disconnected
Engine cooling system drained
Tape, pressure sensitive adhesive
0115 00-1