INSTALLATION
1.
Connect hose (12) and tube elbow (15) on scoop control valve (16).
2.
Install hose tube elbow (10) on hose (13) with hose clamp (11).
3.
Connect hose (13) to scoop control hydraulic resevoir (14) with hose clamp (11).
4.
Install two new seal washers (8) and adapters (1) on side of oil cooler cover (2).
5.
Install new gasket (7) and oil cooler cover (2) on studs (6) of hydrojet housing (5) with eight
washers (4) and new locknuts (3). Tighten locknuts (3) to 2325 lb-ft (3134 Nm).
6.
Connect hose tube elbows (9) and (10) to two adapters (1) on oil cooler cover (2).
7.
Fill scoop control hydraulic reservoir with hydraulic oil (WP 0012 00).
8.
Start engine, engage transmission in forward at idle rpm, and check for oil leaks (TM 5-1940-322-10).
9.
10.
Close hydrojet hatches (TM 5-1940-322-10).