TM 5-1940-322-24
FIELD MAINTENANCE INSTRUCTIONS
BRIDGE ERECTION BOAT (BEB)
MK II-S
P/N 12492423
HYDROJET HATCH COVER, HINGES, AND SUPPORT BRACE MAINTENANCE
REMOVAL, CLEANING AND INSPECTION, AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Personnel Required
Forward Repair System (FRS)
Two
References
Materials/Parts
Equipment Condition
Hydrojet hatches opened and secured
(TM 5-1940-322-10).
0129 00-1