TM 5-1940-322-24
0131 00
SCOOP CONTROL HYDRAULIC RESERVOIR AND HOSES MAINTENANCE (Contd)
INSTALLATION
1.
Apply light coat of sealing compound to threads on site glass (19).
2.
Install site glass (19) in scoop control hydraulic reservoir housing (1).
3.
Install new gasket (18) and hydraulic scoop control reservoir cover (17) on scoop control hydraulic
reservoir housing (1) with four new lockwashers (20) and screws (21).
4.
Install filler cap screen (16) on scoop control hydraulic reservoir cover (17) with three screws (14).
5.
Install filler cap (15) on filler cap screen (16).
6.
Install hose (10) and clamp (9) on tube elbow (8).
7.
Install tube elbow (8) on oil cooler adapter (7).
8.
Install hose (13) and clamp (12) on hydraulic pump inlet tube (11).
9.
Install scoop control hydraulic reservoir (1) on inspection cover (4) with two washers (3) and new
locknuts (2).
10.
Install hoses (10) and (13) and two hose clamps (6) on scoop control hydraulic reservoir housing (1).
11.
Fill scoop control hydraulic reservoir (1) with hydraulic oil (WP 0012 00).
12.
Start engine, engage transmission in forward at idle rpm, and check for oil leaks (TM 5-1940-322-10).
13.
1
15
16
14
21
17
~
2
20
3
18
4
13
1
5
12
19
11
10
9
6
8
7
END OF WORK PACKAGE
0131 00-3/(4 blank)