TM 5-1940-322-24
FIELD MAINTENANCE INSTRUCTIONS
BRIDGE ERECTION BOAT (BEB)
MK II-S
P/N 12492423
TURBOCHARGER REPAIR
DISASSEMBLY, CLEANING AND INSPECTION, AND ASSEMBLY
INITIAL SETUP:
Materials/Parts (Contd)
Tools and Special Tools
Forward repair system (FRS)
References
Materials/Parts
Equipment Condition
Battery hatch opened and secured
(TM 5-1940-322-10).
Battery ground cables disconnected
Engine hatches opened and secured
(TM 5-1940-322-10).
0164 00-1