• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
THERMOSTATIC TRANSMISSION OIL COOLER VALVE ASSEMBLY (LEFT SIDE) TEST AND REPLACEMENT (Sheet 2 of 7)
THERMOSTATIC TRANSMISSION OIL COOLER VALVE ASSEMBLY (LEFT SIDE) TEST AND REPLACEMENT (Sheet 4 of 7)

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -2 Page Navigation
  65    66    67    68    69  70  71    72    73    74    75  
img
TM 5-5420-202-20-2
THERMOSTATIC TRANSMISSION OIL COOLER VALVE ASSEMBLY (LEFT SIDE)
TEST AND REPLACEMENT (Sheet 3 of 7)
REMOVAL:
1.
Place rags or drip pan under tube fittings
(A and B) on transmission.
NOTE
It may be necessary to hold adapters
(C and D) with 1-5/8 inch wrench
while removing tube fittings (AI and
B).
Using 1-1/2 inch wrench, remove tube
2.
fitting (A) from adapter (C).
Place rags or drip pan under tube fittings
3.
(E and F) at oil cooler.
NOTE
It may be necessary to hold adapters
(G and H) with 1-5/8 inch wrench
while removing tube fittings (E and
F).
Using 1-1/2 inch wrench, remove outside
4.
tube fitting (E) from adapter (G).
5.
Move tube (J) aside.
6.
Using 1-5/8 inch wrench, remove adapter
(G).
7.
Using 1-1/2 inch wrench, remove tube
fitting (F) from adapter (H).
Go on to Sheet 4
6-27


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.