• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
THERMOSTATIC TRANSMISSION OIL COOLER VALVE ASSEMBLY (RIGHT SIDE) TEST AND REPLACEMENT (Sheet 2 of 6)
THERMOSTATIC TRANSMISSION OIL COOLER VALVE ASSEMBLY (RIGHT SIDE) TEST AND REPLACEMENT (Sheet 4 of 6)

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -2 Page Navigation
  72    73    74    75    76  77  78    79    80    81    82  
img
TM 5-5420-202-20-2
THERMOSTATIC TRANSMISSION OIL COOLER VALVE ASSEMBLY (RIGHT SIDE)
TEST AND REPLACEMENT (Sheet 3 of 6)
REMOVAL:
1.
Place rags or drip pan under tube fittings
(A and B) on transmission.
NOTE
It may be necessary to hold adapters
(C and D) with 1-5/8 inch wrench
while removing tube fittings (A and
B).
2.
Using 1-1/2 inch wrench, remove tube
fitting (A) from adapter (C).
3.
Using 1-1/2 inch wrench, remove tube
fitting (B) from adapter (D).
4.
Place rags or drip pan under tube
fittings (E and F) on oil cooler.
NOTE
It may be necessary to hold adapters
(G and H) with 1-5/8 inch wrench
while removing tube fittings (E and
F).
5.
Using 1-1/2 inch wrench, remove
outside tube end fitting (E) from
adapter (G).
Using hands, move outside tube
6.
(J).
7.
Using 1-5/8 inch wrench, remove
adapter (G).
Go on to Sheet 4
6-34


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.