• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
THERMOSTATIC TRANSMISSION OIL COOLER VALVE ASSEMBLY (RIGHT SIDE) TEST AND REPLACEMENT (Sheet 5 of 6)
TRANSMISSION OIL COOLER REPLACEMENT (Sheet 1 of 10)

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -2 Page Navigation
  75    76    77    78    79  80  81    82    83    84    85  
img
. . . .
TM 5-5420-202 -20-2
THERMOSTATIC TRANSMISSION OIL COOLER VALVE ASSEMBLY (RIGHT SIDE)
TEST AND REPLACEMENT (Sheet 6 of 6)
Using 1-1/2 inch wrench, install and
7.
tighten tube fitting (F) on adapter (G).
8.
Using 1-1/2 inch wrench, tighten tube
fitting (D) at oil cooler.
Using 1-5/8 inch wrench, install adapter
9.
(H).
Using hands, install tube fitting (J)
10.
on adapter (H).
Go to other end of tube (K) and using 1-1/2
11.
inch wrench, install and tighten tube
fitting (L) on adapter (M).
12.
Using 1-1/2 inch wrench, tighten tube
fitting (J) at oil cooler.
Replenish oil lost during valve assembly
13.
replacement (LO 5-5420-202-12).
14.
Remove rags or drip pan from transmission
and oil cooler.
Start and run engine (TM 5-5420-202-10).
15.
Check for oil leaks.
Shut down engine.
16.
Install engine shroud (page 9-31).
17.
Install transmission shroud (page 9-6).
18.
End of Task
6-37


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.