TM 5-5420-202-20-2
ENGINE SHROUD REPLACEMENT (Sheet 2 of 2)
INSTALLATION:
1.
Using socket, install but do not tighten twenty screws, washers, and lockwashers (B)
2.
Using torque wrench, tighten twenty screws (B) to 20-27 lb-ft (27-37 NZm).
3.
Using cross-tip screwdriver, install two screws and lockwashers (C) securing engine
4.
shroud (A) to powerplant.
5.
Install top deck (page 16-23).
6.
End of Task