• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TURBOSUPERCHARGER OIL DRAIN TUBE (LEFT BANK) REPLACEMENT (Sheet 1 of 3)
TURBOSUPERCHARGER OIL DRAIN TUBE (LEFT BANK) REPLACEMENT (Sheet 3 of 3)

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -2 Page Navigation
  133    134    135    136    137  138  139    140    141    142    143  
img
TM 5-5420-202-20-2
TURBOSUPERCHARGER OIL DRAIN TUBE (LEFT BANK) REPLACEMENT (Sheet 2 of 3)
INSTALLATION:
1.
Cut (3) hoses (A), (B) and (C) to prescribed length (approxi-
mately 3 inches).
Install two hoses (A) and (B) on tube (D).
2.
Install four clamps (E) on tubes (A) and (B).
3.
Install hose (C) on tube (F).
4.
5.
Connect hose (A) to tube (G).
Install two clamps (E) on tube (H).
6.
Install tube (H) between hose (C) and hose (B).
7.
8.
Position six clamps (E) on three hoses (A),
(B) and (C).
Go on to Sheet 3
6-95


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.