TM 5-5420-202-20-2
TURBOSUPERCHARGER OIL DRAIN TUBE (RIGHT BANK) REPLACEMENT
(Sheet 1 of 4)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
Inspection
Installation
TOOLS:
1/2 in. socket with 1/2 in. drive
F l a t - t i p screwdriver
5/16 in. combination box and open end wrench
SPECIAL TOOLS: Ground hop kit
SPECIAL TOOLS:
Ground hop kit (Item 31, Chapter 3, Section I)
SUPPLIES:
Lubricating oil (Item 44, Appendix D)
Gasket
REFERENCES:
PRELIMINARY
PROCEDURES:
NOTE
If clamp (A) cannot be loosened with
screwdriver, use 5/16-inch combination
REMOVAL:
box and open end wrench.
1.
Using screwdriver, loosen six clamps (A) on three hoses (B) on each end of upper drain tube.
Go on to Sheet 2