TM
5-5420-202-20-2
MANIFOLD HEATER OPERATIONAL CHECK (Sheet 1 of 2)
Two
PERSONNEL:
P R E L I M I N A R Y PROCEDURE: Remove powerplant (page 5-2)
O P E R A T I O N A L CHECK:
NOTE
Make this check after any part of manifold heater system is
replaced. It requires two persons to complete.
1.
2.
Station one person on side of engine where maintenance was performed, with his hand
on intake manifold heater tube (A).
Go on to Sheet 2