TM 5-5420-202-20-2
INTERMEDIATE SCAVENGER TUBE REPLACEMENT (Sheet 4 of 4)
Install screw (E) and new lockwasher (F)
4.
to secure intermediate scavenger tube
(B) to cap assembly (C).
Install screw (G) and new lockwasher (H)
5.
to secure intermediate scavenger tube
(B) to cap assembly (C).
Using 7/16 inch socket, tighten
6.
screw (E). Using 1/2 inch
socket, tighten screw (G).
Position clamp (J) over hose (A) and inter-
7.
mediate scavenger tube (B). Using screw-
driver, tighten clamp (J).
Install clamp (K) into intermediate scavenger tube (B).
8.
Using 1/2 inch socket and 1/2 inch wrench, install screw (L) and new self-locking nut (M) to
9.
secure clamp (K) to bracket.
10.
Using 1/2 inch socket and 1/2 inch wrench, install screw (N) and new self-locking nut (P) to
secure clamp (Q) to bracket (R).
11.
End of Task
Change 1
8-20