TM 5-5420-202-20-3
GASKET/GAGE INDICATOR PANEL HARNESS REPLACEMENT (Sheet 6 of 6)
Using 7/16 inch socket, install screw (V)
9.
and new lockwasher (W) securing clamp (X)
and harnesses (A), (Y), and (Z) to overhead
crossbeam (AA).
Using 7/16 inch socket, install screw
10.
(AB) and new lockwasher (AC) securing
clamp (AD) and (AE) and harnesses (A),
(Y), and (Z) to overhead crossbeam (AA).
11.
Using 7/16 inch socket, install screw (AF)
and new lockwasher (AG) securing clamps
(AH) and (AJ) and harnesses (A), (Y), and
(AK) to overhead crossbeam (AA).
At operator's station, connect harness
12.
(AL).
Connect three ground straps at batteries
13.
End of Task
5-64
10-296.62
Change 7