TM 5-5420-202-20-3
INFRARED PERISCOPE CABLE REPLACEMENT (Sheet 2 of 6)
3.
At center post, use 7/16
inch socket to remove
(F) that secure clamp (G),
(C), and ground leads
from gage indicator and
master control panels.
4.
On overhead crossbeam, use 7/16 inch
socket to remove screw (H) and lockwasher
(J) cecuring clamp (K), cable assembly
(B), and harnesses (L) and (M).
5.
Remove cable assembly (B) from clamp
(J).
Remove cable assembly (B) from spring
6.
clamp (N).
7.
At operator's station, unthread cable
assembly (B) from stowage receptacle
(P).
Remove cable (B) from vehicle.
8.
Go on to Sheet 3
10-296.64
Change 7
5-66