• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INFRARED PERISCOPE CABLE REPLACEMENT (Sheet 4 of 6)
INFRARED PERISCOPE CABLE REPLACEMENT (Sheet 6 of 6)

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  368    369    370    371    372  373  374    375    376    377    378  
img
TM 5-5420-202-20-3
INFRARED PERISCOPE CABLE REPLACEMENT (Sheet 5 of 6)
6.
Position cable assembly
(G) in vehicle.
7.
Thread cable assembly
(G) onto stowage
receptacle (H).
8.
Press cable (G) into
spring clamp (J)
on overhead crossbeam.
Place cable (G) in
9.
clamp (K) with har-
nesses (L) and (M).
10.
Using 7/16 inch
socket , install screw
(N) and new lock-
washer (P) to secure
clamp (K), cable (G),
and harnesses (L)
and (M) to overhead
crossbeam.
11.
Place cables (A)
and (G) inside clamp (Q).
12.
Using 7/16 inch socket,
install screw (R) and new
lockwasher (S) to secure
clamp (Q) and ground leads
from gage indicator and
master control panels to
center post.
Go on to Sheet 6
Change 7
10-295-67
6. 9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.