• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FORWARD OUTBOARD LEVER ASSEMBLY REPLACEMENT - Continued
SHIFTING FORWARD CROSS TUBE REPLACEMENT

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  477    478    479    480    481  482  483    484    485    486    487  
img
.
TM 5-5420-202-20-3
FORWARD OUTBOARD LEVER ASSEMBLY REPLACEMENT (Sheet 3 of 3)
Position rod end (C) in lever (D).
3.
4.
Using 9/16 inch wrench, install bolt
(E) in lever (D).
Position rod end (F) in lever (G).
5.
Using 9/16 inch wrench, install bolt
6.
(E) in lever (G).
7.
Adjust shifting controls and linkages
(page 11-53).
Remove blocks from tracks.
8.
End of Task
TA249286
11-20


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.