TM 5-5420-202-20-3
SHIFTING FORWARD CROSS TUBE REPLACEMENT (Sheet 1 of 4)
PROCEDURE INDEX
PAGE
PROCEDURES
Removal
Disassembly
Inspection
Assembly
Adjustment
Installation
9/16 in. combination box and open end wrench (2 required)
TOOLS:
Steel tape
Torque wrench with 3/8 in. drive (0-200 lb-in.)
9/16 in. crowfoot adapter with 3/8 in. drive
SUPPLIES:
Paper (Item 72, Appendix D)
Pencil (Item 71, Appendix D)
REFERENCE:
PRELIMINARY PROCEDURE: Block tracks to prevent vehicle movement
Go on to sheet 2