• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PARKING BRAKE CONTROL ASSEMBLY (ONE PIECE OR FRONT SECTION) AND LINKAGE REPLACEMENT - Continued
PARKING BRAKE CONTROL ASSEMBLY (ONE PIECE OR FRONT SECTION) AND LINKAGE REPLACEMENT - Continued

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  701    702    703    704    705  706  707    708    709    710    711  
img
TM 5-5420-202-20-3
PARKING BRAKE CONTROL ASSEMBLY (ONE PIECE OR FRONT SECTION) AND LINKAGE REPLACEMENT
(Sheet 14 of 17)
21.
Position lever (W) onto base (M) and secure with straight headed pin (AC).
Using pliers, secure straight headed pin
22.
(AC) with cotter pin (AD).
23.
Using hammer and 1/4 inch punch, install
straight pin (AE) and, using hammer and
1/8 inch punch, install new spring pin (AF)
securing lever (W) to base (M).
Position clevis (V) onto lever (W) with
24.
holes alined.
Install straight headed pin (AG).
25.
Using pliers, install cotter pin (AH).
26.
Go on to Sheet 15


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.