• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PARKING BRAKE CONTROL ASSEMBLY (ONE PIECE OR FRONT SECTION) AND LINKAGE REPLACEMENT - Continued
PARKING BRAKE CONTROL ASSEMBLY (ENGINE COMPARTMENT) REPLACEMENT - Continued

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  705    706    707    708    709  710  711    712    713    714    715  
img
. . . . .
TM 5-5420-202-20-3
PARKING BRAKE CONTROL ASSEMBLY (ENGINE COMPARTMENT) REPLACEMENT (Sheet 1 of 15)
PROCEDURE INDEX
PAGE
PROCEDURE
13-107
Removal
13-114
Installation
TOOLS: 9/16 in. socket with 1/2 in. drive
Screwdriver, flat-tip, 1/4 in. tip
Screwdriver, flat-tip, 3/8 in. tip
7/16 in. socket with 1/2 in. drive
3/4 in. socket with 1/2 in. drive
Universal joint with 1/2 in. drive
Ratchet with 1/2 in. drive
10 in. extension with 1/2 in. drive
7 in. long nosed pliers
Torque wrench, 0-175 lb-ft with
1/2 in. drive
7/16 in. open end wrench
9/16 in. open end wrench (2)
8 in. adjustable wrench
15/16 in. open end wrench (2)
7/8 in. open end wrench
6 in. scale
9/16 in. crowfoot with 1/2 in. drive
SUPPLIES:
Gasket
Preformed packings
Packing with retainer
Grease pencil
Paper (Item 72, Appendix D)
PRELIMINARY PROCEDURES:
Block tracks to prevent vehicle movement
(TM 5-5420-202-10)
Place shift lever at N (neutral position)
(TM 5-5420-202-10)
Remove powerplant (page 5-2)
Go on to Sheet 2
13-107
Change 4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.