TM 5-5420-203-14
c. Assembly of the Bridge Separated into Eight Sections - CONT
(20) Installation of Cable Beam.
(a) Slide cable beam (1) on seats (2) and (3) located on the inside girders of far-shore center
sections (4) and (5).
(b) Place one bolt (6) in each side to stop cable beam from sliding. Do not secure cable beam
at this time.
(21 ) Installation of Quadrant.
NOTE
Ensure quadrant retaining holes are 4 1/2* 1/2 in. from the surface of center section
hinges.
(a) Using
a lifting device and sling, position the quadrant (1) facing the near-shore end of the
bridge.
2-26