TM 5-5420-203-14
c . Assembly of the MLC 70 Bridge - CONT
(17) Installation of Near-Shore and Far-Shore Hydraulic Lines.
(a) Position the assembled far-shore
half next to the near-shore
assembly. Align the male and
female hinges.
(b) Thread 10 ft 0 in. flexible
hydraulic hose (1) to hydraulic
connection (2) on far-shore
bridge section (3). Tighten hose
connection.
(c) Thread other end of hose (1) to
hydraulic connection (4) on near-
shore bridge section (5). Tighten
hose connection.
(d) Repeat steps (a) thru (c) for
installing second hydraulic hose
(18) Installation of Bridge Sections, Locking Pins, and Quadrant Hinge Pins.
QUADRANT
QUADRANT
LOCKING PIN
HINGE PIN
Change 2 2-47