TM 5-5420-203-14
c . Assembly of the MLC 70 Bridge - CONT
(20) Installation of Quadrant Struts and Securing Hardware.
(a) Install first of two quadrant struts (1) into strut mount (2) located at the top of quadrant
(3).
(b) Position pin retainer of cable retainer to not get in the way of bolt (4).
(c) Insert bolt (4) through hole in strut
mount (2) through slot in strut (1)
and extend out through bottom of
strut mount.
(d) Thread nut (5) on bolt (4) until
snug. Place locking retainer pin
(6) through hole in bolt (4).
Ensure retainer is secure in bolt.
(e) Repeat steps (a) thru (d) for
second quadrant strut (1).
(21) Attaching Quadrant Struts to Cable Beam.
(a) Insert two quadrant struts (1) in cable beam (2). Insert two bolts (3) through cable beam
(2) and struts (1).
(b) Thread two nuts (4) on two bolts (3) until snug. Place two locking retainer pins (5)
through holes in two bolts (3). Ensure retainers are secure.
2-50 Change 2