TM 5-5420-203-14
CABLE BEAM REPLACEMENT (Sheet 2 of 2)
g. Repeat step f. for opposite side of cable
beam (4). Slide beam (4) clear of clip
angles and quadrant struts (9). Set beam (4)
aside.
INSTALLATION
INSTALL CABLE BEAM (4).
a. Position cable beam (4) on clip angles of
center sections. Aline struts (9) to fit into
slots located on cable beam (4). Slide cable
beam (4) forward to aline holes in clip angles
and StrutS (9).
b. Install two bolts (8) thru cable beam (4)
passing thru struts (9).
c. Install six bolts (12) thru clip angles of
center section securing cable beam (4) in
position.
d. Thread two nuts (7) on two bolts (8).
Tighten nuts (7). Install two retainers (6) in
two bolts (8).
e. Thread six nuts (11) on six bolts (12).
Tighten nuts (11). Install six retainers (10)
in six bolts (12).
f. Place equalizer plate (3) so hole alines in
equalizer plate and cable beam (4). Install
equalizer plate (3) to cable beam (4). Install
equalizer plate retainer pin (1) in equalizer
plate pin (2).
END OF TASK
3-15