TM 5-5420-209-12(9) Launch additional interior bays and move to far shore end span and connect bays (para. 2-20).Table 2-14. Bridge Boats Required for Anchorage.Water VelocityNumber of BaysBoats Required for Anchorage0-3 FPS (0-.9 MPS)613-6 FPS (.9-1.8 MPS)416-8 FPS (1.8-2.4 MPS)31(10) When connecting the last interior bay to bridge centerline, connect bay to far shore ramp bay first. Loosenanchoring lines on both shores, and connect bays. Transporter boom and winch cable or man power maybe required to achieve connection.WARNINGDo not allow traffic on bridge until bridge NCO has verified that all appropriate latches, connectors, andlower lock pins are properly engage. Severe personal injury or equipment damage could occur. Lowerlockpins are in locked position.(11)(12)(13)(14)(15)Refer to para. 2-23 and add additional anchorage.Lower approach ramp (8).Repeat Step (11) for remaining approach ramps.Open hydraulic pump cover (4) and set pump control lever (5) to TRAFFIC position, close vent valve (6), andclose cover (4).Raise all handrails (9).CAUTIONDo not unlatch bay/bay connectors between ramp bays and interior bays. Equipment damage will occur.(16) Unlatch bay upper connectors (10) between interior bays.(17) Refer to para. 2-24 for bridge operation guideline.2-85
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business