(3) Launch remaining interior bays and connect (para. 2-20) to existing assembly along near shore. Add an-
chorage as needed.
(4) Launch and secure ramp bay (4) to last interior bay (para. 2-18).
Figure 2-22. Bridge Assembly Swinging Bridge Method (Sheet 1 of 3).
(5) After last ramp bay is connected, ramp bay must be raised. Procedures for
Hydraulic pumps must be
cylinders.
CAUTION
operated simultaneously and in
(a)
(b)
(c)
(d)
(e)
(f)
Open pump access covers (5).
Open Vent valves (6).
Set pump control levers (7) to PUMP.
Activate pump handles (8) and raise ramp bay.
Close pump access covers (5).
Repeat Steps a through e for remaining ramp bay.
raising ramps are as
unison to prevent damage to both pump and
follows:
2-87