TM 5-5420-209-12(3) Launch remaining interior bays and connect (para. 2-20) to existing assembly along near shore. Add an-chorage as needed.(4) Launch and secure ramp bay (4) to last interior bay (para. 2-18).Figure 2-22. Bridge Assembly Swinging Bridge Method (Sheet 1 of 3).(5) After last ramp bay is connected, ramp bay must be raised. Procedures forHydraulic pumps must becylinders.CAUTIONoperated simultaneously and in(a)(b)(c)(d)(e)(f)Open pump access covers (5).Open Vent valves (6).Set pump control levers (7) to PUMP.Activate pump handles (8) and raise ramp bay.Close pump access covers (5).Repeat Steps a through e for remaining ramp bay.raising ramps are asunison to prevent damage to both pump andfollows:2-87