ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
o.
Rule 3a
Lower RRB to increase nose lift (N), (CRB is in the high position). If there is ample tail clearance, some increase in
N can be obtained by keeping the CRB in its highest position and lowering the RRB to its lowest position. The
mathematical equation for this process is shown under Table 3-28, column (m). N Rule 3a. - N Rule 2 + Value N
calculated from the equation shown under Table 3-28, column (m).
p.
Rule 3b
Lower CRB to increase tail clearance (T), (RRB is in the high position). If there is ample nose clearance, some
increase in T can be obtained by keeping the RRB in the highest position and lowering the CRB to its lowest position. The
mathematical equation for this process is shown under Table 3-28, column (n).
T Rule 3b. - T Rule 2 + Value T calculated from the equation shown under Table 3-28, column (n).
Table 3-28, column (n). Table 3-28. Rule 3a and 3b - DS 13-22 Bay w/o LRS
Rule 3a.
Rule 3b.
Lowering RRB to increase N
Lowering CRB to increase T
2E + # OF
BAYS
N
(m)
T
(n)
13
1.9 (0.82-G)
0.2 (2.93H)
14
1.9 (0.79-G)
0.2 (2.90H)
15
1.9 (0.76-G)
0.2 (2.80H)
16
1.9 (0.72-G)
0.2 (2.68H)
17
1.9 (0.69-G)
0.2 (2.94H)
18
1.9 (0.66-G)
0.2 (2.79H)
19
1.9 (0.63-G)
0.2 (1.97H)
20
1.9 (0.63-G)
0.2 (1.86H)
21
1.9 (0.60-G)
0.2 (1.42H)
22
1.9 (0.57-G)
0.2 (1.29H)
q.
Loads required
From Table 3-29, determine the truck and trailer loads required for the bridge.
Table 3-29. MGB Pallets DS 13-22 Bay w/o LRS
No. of Bays
Pallet Type
13-15
16-18
19-21
22
Erection *
1
1
1
1
Bridge
8
9
10
11
Total
9
10
11
12
* Increase quantity by one (1) if one pallet is loaded with additional erection components required from the LRS.
Increase quantity by two (2) if complete LRS is used to obtain additional erection components required.
3-40