ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
h.
Check bearing
(1)
If the near bank bearing is within the minimum and maximum bearing limits, it is not necessary to shift
the position of the F and F pegs. The positions will be as initially determined, F peg (minimum from Table 3-32) from A
peg and the F peg will be placed the distance determined as near bank bearing measured from the A peg.
(2)
If the near bank bearing is more than the maximum bearing allowable (2.3 m), it will be necessary to
shift the bearing.
i.
Shift bearing
(1)
Determine the amount of excess near bank bearing by subtracting the maximum bearing allowed from
the amount calculated. At this point decide how to use the excess bearing as follows:
either
(a)
Add the excess bearing to the initial far bank bearing (minimum from Table 3-32).
or
(b)
Add the initial far bank and near bank bearings together, then divide by 2, resulting in an equal
amount of bearing on both banks.
or
(c)
Add the initial far bank and near bank bearings together, then divide the total bearing as you see fit,
as long as minimums are met and maximums are not exceeded.
(2)
Regardless of what is done, the locations of the F, F, CRB,FRB, RRB and O pegs will not change or
shift on the site. The location of the A and A pegs do not change, nor does the width of the AR Gap.
(3)
There are situations that will result in the maximum bearings being exceeded on both banks, due to the
overlaps of gaps and bridge lengths or by making an error in the deign process. When this occurs:
either
(a)
Dig out the soil from the bank until the bearing area will be less than the maximum.
or
(b)
Pack up (place timbers) under the end of bridge upon completion. This packing must provide
enough bearing surface to equal the minimum bearing for the bridge.
j.
Key construction points
Locate the key construction points on the site and take elevations as follows:
(1)
Estimate or measure the elevations of the F, CRB, FRB, RRB and O pegs. Convert the elevation of the
CRB to datum, 0.0 elevation.
(2)
Convert the elevations of the F, RRB and O pegs, using the CRB as datum. Elevations above the datum
line are positive, elevations below datum are negative.
(3)
Place the elevations on the pro-forma as shown in Figure 3-15.
3-44