ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-13-17DOUBLE STORY 2E+13 thru 2E+22 BAY DESIGN WITH LRSThe procedures that follow are for design of DS 2E + 13 through 2E + 22 bay MGBs (w/LRS) on normal siteswhere water level or any obstructions are at least 3.7 m below bank heights:a.Measure the AR gap (para. 3-10a)b.Select a bridge (para. 3-10b and Table 3-31)Table 3-31. DS MGB Design13-22 Bays with LRSSite and Bridge DimensionsAR GAPRANGES(a)MLC*(b)2E + No. ofBays(c)BridgeLength L(d)R Distance(e)Nose Const(f)28.3-30.970(T)1332.927.77N130.2-32.870(T)1434.829.07N132.0-34.170(T)1536.629.07N133.8-36.470(T)1638.429.68N135.6-38.270(T)1740.229.68N137.5-40.170(T)1842.129.66N1+3N239.3-41.970(T)1943.935.16N1+3N241.1-43.770(T)2045.738.76N1+3N243.0-45.170(T)2147.638.76N1+3N244.8-46.270(T)2249.440.56N1+3N2* See step k. Slope Check and Table 1-1 for crossing restrictions and MLC 100(W) capability. (T) = Trackedc.Bridge LengthRead and note the number of bays and bridge length, Table 3-31 columns (c) and (d).d.R DistanceRead and note the R distance, Table 3-31 column (e).e.Nose ConstructionRead and note the nose configuration, Table 3-31 column (f).f.Key Construction PointsIdentify, locate and take elevations at the key construction points. These construction points are explained below andshown in Figure 3-15.(1)F peg-Designates the location of the far bank end of bridge (outer edge of bankseat beam). Initiallyplaced distance given as minimum bearing in Table 3-32 for the bridge being designed. The distance, between the A andF peg is the amount of bridge that will bear on the far bank, and is known as the far bank bearing.3-42
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business