ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1(7)Hook an anchor chain ratchet to large shackle on each side of trailer at rear; open part of hook faces down.(8)Pull up release lever on ratchet assembly and turn tension adjustment until hook is extended about 3 in (7.62cm).(9)Release chain from ratchet by pressing chain release lever down.(10) Put hook end of chain through pear shaped lifting ring at rear of pallet. (The extractor end of the pallet isconsidered the rear).(11) Hook chain back on itself.1574(12) Pull chain tight and attach it to chain ratchet assembly3-126
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business