ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
(4)
Hook an anchor chain ratchet assembly to each pear link lifting ring at rear of pallet. The extractor end of the
pallet is considered the rear.
(5) Press tension release lever on underside of ratchet assembly and turn tension adjustment until hook is
extended about 3 in (7.62 cm).
(6)
Release chain from ratchet assembly by pulling chain release lever down and away from ratchet.
(7)
Hook one end of chain in tailgate chain hole in dump truck body.
3-130