ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
(9)
Lift bridge from roller beam with cable pullers using two personnel on each puller handle with handle fully
extended. Ensure that the puller cable does not become fouled on the davit frame.
(10) Lift bridge until safety chains can be connected to jacking brackets. Secure both chains to brackets with
bracing pins and retainer clips.
4-86