TABLE 5-2. Building and Boom Table - 9 through 12 Bay Single Story (Normal Site)
Bridge ft
56
62
68
74
Length m
17.1
18.9
20.7
22.6
Bays
9
10
11
12
L/Nose
5N1
5N1
6N1
6N1
Build
Notes a,b,c,d
Notes a,b,c,d
Notes a,b,c,d
Notes a,b,c,d
Boom
1p2
1p2
1p2
1p2
Add
Note e,f
Note e,f
Note e,f
Note e,f
4,1N1*
4,1N1*
4,1N1*
4,1N1*
5,2N1
5,2N1
5,2N1
5,2N1
6
6
6
6
3N1,4N1,5N1
3N1,4N1,5N1
3N1,4N1,5N1
3N1,4N1,5N1
Boom
1p4
1p4
1p4
Add
7
7 + 6N1
7 + 6N1
Boom
2p0
1p5
Add
8
8
Boom
2p1
Add
9
Launch
(1p5)
(2p4)
(1p5)
(2p7)
Position
LRP^
LRP^
LRP^
LRP^
Launch
6p5
8p5
7p5
9p5
Remove
Notes g, h
Notes g, h
Notes g, h
Notes g, h
Add
7,8,9,BSB
9,10,BSB
8,9,10,11,BSB
10,11,12,BSB
Launch To
Note i
Note i
Note i
Note i
Complete By
Note j
Note j
Note j
Note j
NOTES:
a.
Put BSB on RB.
b.
Add Bay 1 and put BP under 1p7.
c.
Fit nose roller.
d.
Add Bay 2 and put BP under 2p4.
e.
Add Bay 3 (with headless pin) and put BP at 3p7.
f.
Add LNCG posts, LNCG, nose roller and LLN.
g.
Remove LLN.
h.
Remove LNH sections as they pass LRP.
i.
Launch until far bank end of bridge is 9 in (23 cm) from LRP or BSB overhangs RB by 1.5 ft (0.5 m). If
minimum bearing is being used, launch to center hole in BSB.
j.
Put bridge on the ground.
^
Position LRP 9 in (23 cm) from F peg.
( )
Center of gravity.
*
Add LRP and secure with tie down strap.