ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1TABLE 5-4. Delaunch Table 4 through 8 Bay Single Story (Normal Site)Bridge ft.2632384450Length m.7.99.811.613.415.2Bays4567L/NoseLLNLLNLLNLLNLLNBuildNotes a,b,c,d,eNotes a,b,c,d,eNotes a,b,c,d,eNote a,bNote a,bRemoveBSBBSBAdd[5D][8, BSB, 4D][9,10,BSB,5D]Notes c,d,eNotes c,d,eDelaunch(2p7)(3p3)(4p2)(5p2)(6p2)RecoverLRLRLRLRLRBoom5p3Remove[BSB,5D]Boom4p7Remove[10]Boom4p34p3Remove[BSB,4D][9]Boom3p73p7Remove[8]8Boom3p33p33p3RemoveBSB,[5D]77Boom2p72p72p72p7RemoveBSB666Boom2p32p32p32p32p3RemoveBSB5555Boom1p71p7p71p71p7Remove44444Boom1p21p21p21p21p2RemoveNote fNote fNote fNote fNote f33333BoomBSB Note gBSB Note gBSB Note gBSB Note gBSB Note gRemove22222BoomNote hNote hNote hNote hNote hRemove11111Complete ByNotes i, jNotes i, jNotes i, jNotes i, jNotes i, jNOTES:a.Remove curbs, deck units and ramps.c.Add LLN.e.Put BP as required to keep bridge off theground.g.Move BP to 1p7.i.Remove LLN.[ ]Counterweight. (Counterweight BSBconnected by shootbolts only).b.Install rb under bridge min 1.5 ft (0.5m)from the end. If minimum bearing is beingused, position RB under center hole in BSB.d.Install LR 9 in (23 cm) from BSB.f.Move BP to 2p7.h.BSB over BP.j.Remove BSB. Clear site..( )Center of gravity.5-6
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business