TABLE 5-5. Delaunch Table - 9 through 12 Bay Single Story (Normal Site)
Bridge ft
56
62
68
74
Length m
17.1
18.9
20.7
22.6
Bays
9
10
11
12
L/Nose
5N1
5N1
6N1
6N1
Build
Notes a thru e
Notes a thru e
Notes a thru e
Notes a thru e
Delaunch
6p5
8p5
7p5
9p5
Remove
BSB,9,8,7
BSB,10,9
BSB,11,10,9,8
BSB,12,11,10
Add
Note f
Note f
Note g
Note g
Delaunch
(1p5)
(2p4)
(1p5)
(2p7)
Recover
LRP
LRP
LRP
LRP
Boom
2p0
2p1
Remove
8
9
Boom
1p5
Remove
8
Boom
1p4
1p4
1p4
Remove
7
6N1,7
6N1,7
Boom
1p2
1p2
1p2
1p2
Remove
5N1,4N1,3N1
5N1,4N1,3N1
5N1,4N1,3N1
5N1,4N1,3N1
6
6
6
6
2N1,5
2N1,5
2N1,5
2N1,5
1N1, LLN
1N1, LLN
1N1,LLN
1N1,LLN
4
4
4
4
Note h
Note h
Note h
Note h
3
3
3
3
Boom
BSB
BSB
BSB
BSB
Note i
Note i
Note i
Note i
Remove
2,1
2,1
2,1
2,1
Complete By
Note j
Note j
Note j
Note j
NOTES:
a.
Remove curbs, deck units and ramps.
b.
Install RB under bridge minimum 1.5 ft (0.5m) from end. If minimum bearing is being used, position RB
under center hole of BSB.
c.
Position center of LR (in LRP) 8 ft (2.4 m) from BSB.
d.
Position BP as required to keep bridge off ground.
e.
Add LNCG posts, LNCG, nose roller and 3 LNH. Reposition LRP [base 9 in (23 cm) from BSB]. Add LNH 4.
f.
Add LNH5 and LLN.
g.
Add LNH5, LNH6 and LLN.
h.
Move BP to 2p7. Remove nose roller, LNCG and LNCG posts.
i.
Move BP to lp7
j.
Remove BSB. Clear site.
( )
Center of gravity.