ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
(2)
Place far bank bankseat beam on packing
(3)
Fit first pair of top panels and position single baseplates and packing under the end of bay 1. Packing
on baseplate must be stacked high enough to keep rear of bridge from touching existing span.
(4)
Add bay 2
(5)
Position and stack packing (3 in x 8 in x 36 in) under bankseat beam and bay 1. Packing must be
stacked high enough to keep bridge clear of existing bridge.
5-43