ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
(6)
Push down on end of bay 2 and remove packing from under bankseat beam.
(7)
Lift end of bay 2 and reposition baseplates and packing under rear of bay 2.
(8)
Add bay 3.
(9)
Lift end of bay 3 and reposition baseplates and packing under rear of bay 3.
(10) Add bay 4 and bay 5.
(11) Lift end of bay 5 as high as possible and place packing under end of bay 5. This must be done to
ensure that as bays are added, they will not contact existing bridge before all bays are connected.
5-44