• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
MANIFOLD HEATER OPERATIONAL CHECK
MANIFOLD HEATER FUEL RETURN HOSE ASSEMBLY REPLACEMENT

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -2 Page Navigation
  495    496    497    498    499  500  501    502    503    504    505  
img
. .
TM 5-5420-226-20-2
MANIFOLD HEATER OPERATIONAL CHECK (Sheet 2 of 2)
check for heat. If no heat is felt,
Have person near intake manifold heater tube
7.
refer to troubleshooting.
When checks are completed, hold ENGINE FUEL SHUTOFF switch (L) to OFF (up) position.
8.
Set MASTER BATTERY switch (M) to OFF (down) position.
9.
Disconnect engine from powerplant test run hookup (page 5-40).
10.
Install powerplant (page 5-14).
11.
TA107906
End of Task
7-299


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.