• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
WERPLANT TESTS (GROUND HOP) - Continued
CHAPTER 6. ENGINE MAINTENANCE

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -2 Page Navigation
  38    39    40    41    42  43  44    45    46    47    48  
img
. . .
TM 5-5420-226-20-2
POWERPLANT TESTS (GROUND HOP) (Sheet 16 of 16)
After Test Disconnect (Sheet 1 of 1 )
1. Disconnect three battery ground straps (page 10-268).
2. Disconnect four electrical cable assemblies and three hose assemblies from powerplant and hull
(page 5-27).
3. Remove fabricated tachometer assembly,
4. Using 7/16-inch socket with ratchet, loosen clamp nut
that secures right ground hop hose assembly clamp.
5. Remove ground hop hose assembly with clamp
and filter from turbosupercharger elbow.
6.
Position air cleaner hose assembly with clamp
to right turbosupercharger elbow.
7.
Using 7/16-inch socket with ratchet, tighten
clamp nut to secure air cleaner hose asembly to
turbosupercharger elbow.
Repeat steps 4 through 7 on left side.
8.
Install powerplant (page 5-14).
9.
End of Task
5-40
Change 4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.