• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
EXHAUST PIPE (LEFT SIDE) REPLACEMENT - Continued
EXHAUST PIPE (LEFT SIDE) REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -2 Page Navigation
  640    641    642    643    644  645  646    647    648    649    650  
img
.
TM 5-5420-226-20-2
EXHAUST PIPE (LEFT SIDE) REPLACEMENT (Sheet 3 of 4)
INSTALLATION:
1.
Position packing (A) and clamp (B) onto pipe (C) and, using flat-tip screwdriver, tighten
screw on clamp (B), securing packing to pipe (C).
2.
Check insulation halves (D) and all attaching hardware for damage. Replace if necessary.
3.
Position insulation halves (D) onto
exhaust pipe (C).
Using wrench and cross-tip screwdriver, install 14 screws (E), each with two flat washers
4.
(F), one lockwasher (G), and one nut (H) to hold insulation halves (D) to exhaust pipe
(C).
Position new gasket (J) onto turbosupercharger housing (K).
5.
Slide exhaust pipe extension (L) into
6.
tube (M) as far as it will go.
Position exhaust pipe (C) with installed
7.
insulation halves (D) onto turbosupercharger
housing (K). Make sure exhaust Port
(N) is pointing up.
TA107950
Go on to Sheet 4
8-7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.