• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
EXHAUST PIPE (RIGHT SIDE) REPLACEMENT - Continued
EXHAUST PIPE (RIGHT SIDE) REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -2 Page Navigation
  644    645    646    647    648  649  650    651    652    653    654  
img
.
TM 5-5420-226-20-2
EXHAUST PIPE (RIGHT SIDE) REPLACEMENT (Sheet 3 of 4)
INSTALLATION:
1.
Position packing (A) and clamp (B) onto pipe (C) and, using flat-tip screwdriver, tighten
screw on clamp (B) securing packing to pipe (C).
Check insulation halves (D) and all attaching hardware for damage. Replace if necessary.
2.
Position insulation halves (D) onto exhaust pipe (C).
3.
Using 5/16 inch wrench and cross-tip screwdriver, install 14 screws (E), each with two
4.
flat washers (F), one lockwasher (G), and one nut (H), to hold insulation halves (D) to
exhaust pipe (C).
Position new gasket (J) onto turbosupercharger
5.
housing (K) .
Position exhaust pipe (C) with installed
6.
insulation halves (D) onto turbosupercharger
housing (K). Make sure exhaust port
(L) is pointing up.
Using 9/16 inch socket and open end
7.
wrench, install six nuts (M) securing
exhaust pipe to housing.
Go on to Sheet 4
8-11


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.