TM 5-5420-226-20-3
SHIFT LINKAGE ADJUSTMENT (Sheet 20 of 28)
102.
Using 9/16 inch wrench, remove two screws (BJ).
103.
Manually remove stud and rod end bearing
assembly (BK).
104.
Using 6 inch rule, measure center to center
distance between rod end holes. If measure-
ment is 5-3/4 inches, assembly is in adjust-
ment and go to step 119. If measurement is
not 5-3/4 inches, go on to step 105.
105.
Using vise and 9/16 inch wrench, loosen
j a m n u t (BL).
106.
Using vise and 9/16 inch wrench, turn rod
bearing end (BM) clockwise or counter
clockwise until distance between centers
of rod bearing ends (BM) and (BN) measures
5-3/4 inches.
107.
Using small diameter wire, check to see if rod (BP) is past holes (BQ) and (BR). If rod (BP)
is past holes (BQ) and (BR), go on to step 108. If rod (BP) is not past hole (BQ), do steps
109 thru 113. If rod (BP) is not past hole (BR), go on to step 114.
Using vise, torque wrench, and 9/16 inch crow foot adapter, tighten jamnut (BL) to
108.
16-18 lb-ft (22-24 Nm) while maintaining 5-3/4 inch measurement. Go on to step 119.
Go on to Sheet 21
TA169073
11-72