• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SHIFT LINKAGE ADJUSTMENT - Continued
SHIFT LINKAGE ADJUSTMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  538    539    540    541    542  543  544    545    546    547    548  
img
TM 5-5420-226-20-3
SHIFT LINKAGE ADJUSTMENT (Sheet 24 of 28)
At top of transmission, check position
125.
of shifting position indicator (D). If
shifting position indicator (D) is pointing
to forward most dot (E), linkage is in
adjustment. Go to step 156. If shifting
position indicator (D) is not pointing
to most forward dot (E), go on to step
126.
Using 9/16 inch wrench, loosen jamnuts
126.
(BT) and (BU).
127.
Using 9/16 inch wrench, remove screw (F),
if not removed in step 4.
Manually move shifting posit ion indicator
128.
(D) to most forward dot (E).
129.
Insert locating pin in alinement hole (C), if not inserted in step 124.
NOTE
It may be necessary to move shifting position indicator (D) to rear most dot to adjust
shifting rod bearing end (G) and then back to forward most dot (E) to check adjustment
in step 130.
Using 9/16 inch wrench, adjust shifting rod bearing end (G) by turning clockwise or counter-
130.
clockwise until screw (F) will drop freely through shifting rod bearing end (G) and clevis
(H).
TA169077
Go on to Sheet 25
11-76


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.